Seminar Outline

Our seminar is divided into individual, day-by-day courses, allowing you to attend either one, two, or three days. When you attend less than the full three days, we highly recommend you attend the first day as the common procedures for all projects will be addressed only on the first day to eliminate redundancies. Safety is of primary importance and is addressed throughout the seminar.

Immediately following each guest speaker's presentation and just prior to daily adjournment, participants will have an opportunity for questions, comments, and special requests.

Guest Speakers

Retired Contractor
From the Owner’s Perspective - Decision to Implode 17 Stories National Bank Bldg

Seismologist
Summarize and Evaluate the Seismic Effect of Implosion of Company Projects

Manufacture Representative
Explosive Products and Selection

Insurance Representative
Managing Liabilities and Claims

Professional Engineer
Experienced for Implosion Calculations

Frank Leux Building

Seminar Content

Introduction

Goal of Seminar
Conventional Demolition vs. Implosion
Define the Design of Implosion
Define the Science of Implosion
Definition of Implosion
Implosion Myth and Facts
Prime Structures for Implosion
Assess Surrounding Liabilities
Reverse Engineering of Structures
Creating a Safe Implosion Site
Identify and Manage Risk of Implosion
Prerequisite for Implosion


 

 

 

 

Concrete Column Buildings

Columbus Homes 5 through 8

Goal of Implosion Team
Implosion Team
Project Overview
Site Overview
Project Scope
Decision for Demolition Method
Accurate Estimating
Develop Proposal
Contract Review and Acceptance
Develop Implosion Plan
Analyzing the Direction of Fall
Analyzing Location to Detonate
Drilling for Explosive
Pre-Weakening of Structure
Selection and Quantity of Explosive
Explosive Placement
Internal Protective Measures
External Protective Measure
Noise Management
Dust Management
Community and Media Relationship
Site Security
Pre-Implosion Survey
Implosion of Columbus Homes
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

Sheer Wall Concrete Building

Crisantemos I and II
Project Overview
Implosion Team
Site Overview
Project Scope
Community Concern
Political Concerns
Working with Local Labor
Analyzing Direction of Fall
Analyzing Location to Detonate
Sheer Wall vs. Columns
Pre-Weakening Sheer Wall
Drilling and Explosive Placement
Selection and Quantity of Explosive
Wiring Sheer Wall
Pre-Implosion Survey
Implosion of Crisantemos
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

Commercial Steel Structure

Wolverine Hotel
Project Overview
Implosion Team
Site Overview
Project Scope
GEM Theatre
Analyzing Direction of Fall
Analyzing Location to Detonate
Pre-Weakening of Structure
Selection and Quantity of Explosive
Explosive Placement
Internal Protective Measures
External Protective Measure
Day of Implosion
Weather
Pre-Implosion Survey
Implosion of Wolverine Hotel
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

 

Power Houses

RS Wallace
Project Overview
Implosion Team
Site Overview
Project Scope
Analyzing Direction of Fall
Analyzing Location to Detonate
Pre-Weakening of Buildings
Selection and Quantity of Explosive
Explosive Placement
Internal Protective Measures
Pre-Implosion Survey
Implosion of RS Wallace
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

Conners Creek
Project Overview
Implosion Team
Site Overview
Project Scope
Analyzing Direction of Fall
Analyzing Location to Detonate
Pre-Weakening of Buildings
Selection and Quantity of Explosive
Explosive Placement
Internal Protective Measures
Pre-Implosion Survey
Implosion of Conners Creek
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

Combination of Concrete and Steel Bldg.

St. John General Hospital
Project Overview
Implosion Team
Site Overview
Project Scope
Analyzing Direction of Fall
Analyzing Location to Detonate
Selection and Quantity of Explosive
Explosive Placement
Protective Measures for Pillars
Neighborhood
Implosion of St. John General Hospital
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

National Bank Building
Project Overview
Implosion Team
Site Overview
Project Scope
Analyzing Direction of Fall
Analyzing Location to Detonate
Pre-Weakening of Structure
Selection and Quantity of Explosive
Explosive Placement
Internal Protective Measures
Noise Management
External Protective Measures
Pre-Implosion Survey
Implosion of National Bank
Post Implosion Results
• All Clear
• Post Blast Survey
• Clean-Up
• Lessons Learned

Bridges And Piers

Bridges
Project Overview
Implosion Team
Site Overview
Project Scope
Pre-Weakening of Structure
Selection and Quantity of Explosive
Explosive Placement
Protective Measures
Special Conditions
Sizes
Environmental
Channel Opening
Post Implosion Results
All Clear
Post Blast Survey
Clean-Up
Lessons Learned

Piers
Blasting Piers

Miscellaneous Challenging Conditions
Unique to Below Project Issues

Flare Tower
190-D Building, Hanford Nuclear Plant
National Steel – Bridge
INEEL Stacks
Blasting Underground Storage Tanks
Sears Warehouse
Calgary General Hospital
Radar Dome
Al Khobar Towers
Canberra Australia
Dupont Stacks
Demolishing Equipment

Notice of Disclaimer:

The content of this Seminar is for informational and educational purposes only. Attendance and participation at this Seminar does not qualify any person, nor provide any of the requisite expertise training necessary, to in any way participate in the implosion industry, nor does it qualify one to instruct others regarding the design and engineering of implosion. Any representation, oral or written, expressed or implied, by BigBlast LLC that the content of this Seminar is for any purpose other than informational or educational, is hereby disclaimed by BigBlast LLC.

BigBlast, LLC | PO Box 1909, Coeur d'Alene, ID 83816 | 877-85-BLAST (877-852-5278) | 208-676-9900 | Fax: 208-676-9800 | info@bigblast.com

Design by Tim Martin at Top Step Design. Programming Copyright © 2004-2006 Daniel Kauffman at Rock Solid Solutions.